News and Documents
Trails End Construction
- Trails End area map
- Trails End – Powerpoint Presentation
- Alignment Map 1
- Alignment Map 2
- Alignment Map 3
- Trails End Questions and Answers
- Trails End Road Impact Study
Public Notices
- Request for Quotations for Indepedent Audit Services
- BCRUA Responses to Questions Submitted by Audit Firms RE: RFQ
- Request for Qualifications for Geotechnical and Materials Testing
- Request for Proposals for Water Treatment Plant Construction Inspection
- Request for Proposals for BCRUA Investment Advisory Services* *Please notify the BCRUA by e-mail rr_solicitations@round-rock.tx.us to confirm download of any solicitation documents (subject must be “RR_Solicitations” or email may be blocked by our spam filter). This will ensure your contact information is updated and maintained for prompt notification of any changes or addendums to solicitations.FAILURE TO SIGN AND INCLUDE ALL ISSUED ADDENDUMS WILL DISQUALIFY SUBMITTED BIDS AND PROPOSALS
- Addendum to Request for Proposals for BCRUA Investment Advisory Services
News Releases
- BCRUA approves agreements for accounting & water plant supervision – April 2011
- Contractor Selected for Raw Water Pipeline
- Rhode Resigns from BCRUA Board; George White Appointed – February 2009
- Meeting with Volente Postponed – August 2008
- Volente Survey – March 2008
- BCRUA Board Meeting – December 2007
- Volente Meeting – November 2007
- Brushy Creek Barge – October 2007
- BCRUA – Board of Directors Appointed
Newsletters
- BCRUA News – BCRUA E-Newsletter, July 2009
- “Water Matters” – BCRUA E-Newsletter, May 2009
- Volente Update, June 2008
- Overall Project Update, April 2008
- Volente Update, November 2007
- Trails End Update, October 2007
- Water Treatment Plant Update, August 2007
- Volente Update, July 2007
- Trails End Update, July 2007
Maps
Diagrams & Photos
Reports
- Phase 1 Raw Water Preliminary Design Report (October 2007)
- Report Cover Page, Table of Contents, List of Tables and List of Exhibits
- Executive Summary (same document as previously posted below)
- 1.0 Introduction
- 2.0 Phase 1 Raw Water Pipeline Route Study
- 3.0 Floating Intake Modifications
- 4.0 Raw Water System Hydraulic Analysis
- 5.0 Pipe Design Guidelines
- 6.0 Phase 1 Raw Water Pipeline Preliminary Plans
- 7.0 Raw Water Pipeline Guide Specifications
- 8.0 Permitting
- 9.0 Phase 1 Project Cost
- 10.0 Construction Phasing & Project Schedule
- Appendix A – Route Study Tables and Exhibits
- Appendix B – 1″=100′ Plan and Profile Drawings
- Appendix C – Desktop Geotechnical Assessment
- Appendix D – Environmental Impacts
- Phase 1 Raw Water Preliminary Design Report – Executive Summary (October 2007)(same document as posted above)
- Final Draft — Summary Report for Deep Water Intake Study
- Preliminary Engineering Report
- Intake 7 Sites Report – Draft
- Trails End Road Impact Study
- Environmental Issues and Constraints Associated with Joint Intake with City of Austin
- HDR Study of Joint Intake with City of Austin
- Lake Travis Water Supply Study
- Raw Water Pipeline Route Analysis
- Intake and Pipeline Technical Feasibility Analysis
- Due Diligence Analysis – Deep Water Intake Draft – April 21, 2010
- Due Diligence Update – October 2011
Legislative Issues
Blog
Trails End Presentation
- Trails End – Powerpoint Presentation
- Alignment Map 1
- Alignment Map 2
- Alignment Map 3
- Trails End Questions and Answers
Surveys
Organizational Documents
